AOM Energy/Industrial: 345 Hudson Decarbonization – Phase 2
The project advanced the 978,277-sq-ft, 17-story office building’s transition to electric-powered heating and cooling through water-source heat pumps and an ambient loop.
The project advanced the 978,277-sq-ft, 17-story office building’s transition to electric-powered heating and cooling through water-source heat pumps and an ambient loop.