Award of Merit Energy/Industrial: Pioneer Power Generation Station Phase IV
Ahead of projected load growth in the Bakken region, Basin Electric Power Cooperative needed new generation capacity online by summer 2025.
Ahead of projected load growth in the Bakken region, Basin Electric Power Cooperative needed new generation capacity online by summer 2025.