AOM Government/Public Building: Trans-Jordan Waste Transfer Station
Underneath this 46,000-sq-ft waste transfer facility is a tunnel system that runs below the tipping floor, which allows heavy haulers to load waste for landfill trips in a significant departure from traditional transfer station design.