E+S slide rail systems now available from AGD | Construction Enquirer News
About this article
Hirer offers pioneering system
E+S invented the first trench shoring systems in Germany in the 1950s. They were the first company to design the slide rail system which facilitates quick and easy installation of small cofferdams and excavation pits up to 9m depth. AGD has just installed its first slide rail excavation pit and is now offering the system for sale or hire nationwide throughout the UK and Ireland. A hire installation service with excavators and skilled operatives is also available alongside a full design service.