Train Station and Footbridge / Estudio Herreros | ArchDaily
About this article
Completed in 2025 in Santiago de Compostela, Spain. Images by Luis Díaz Díaz, Manuel Vicente. In 2011, seventy years after the arrival of the railway in Santiago de Compostela, the out-of-town trench occupied by the tracks remained an almost...
Save this picture!© Luis Díaz Díaz+ 31 Curated by Valentina Díaz Share ShareFacebookTwitterMailPinterestWhatsappOrhttps://www.archdaily.com/1033624/train-station-and-footbridge-estudio-herreros Clipboard "COPY" CopyTrain Station•Santiago de Compostela, Spain Architects: Estudio Herreros Area Area of this architecture project Area: 12850 m² Year Completion year of this architecture project Year: 2025 Photographs Photographs:Luis Díaz Díaz, Manuel VicenteCategory: Train StationAuthors: Juan Herreros, Jens RichterProject Leader: Abraham Piñate (eH)Project Engineering: Prointec y BACBCGPre Project Engineering: INECOConstruction Management: INECO (Gabriel García)Construction Technical Support: TylinE H Team: Victor Lacima, Martha Sosa-Días, Beatriz Salinas, Irene Rodríguez, Manuel García-Lechúz, Alberto Martín, Juan Carlos Bragado, María Escudero, Alex Orive, Ana Torrecilla, Raúl García, José Baldó, Inma SolerCollaborators: R & ASConstruction Firm: UTE Copasa + Taboada y RamosCity: Santiago de CompostelaCountry: SpainDid you collaborate on this project?More SpecsLess Specs Save this picture!© Luis Díaz Díaz Text description provided by the architects. In 2011, seventy years after the arrival of the railway in Santiago de Compostela, the out-of-town trench occupied by the tracks remained an almost insurmountable barrier between the historic center and the neighborhoods that had emerged south of the railway line, with Pontepedriña at the forefront. On the other hand, this bound...